Azinheira Windfarm
Parque Eólico do Vale de Abade, Lda.
Catavento, SA - 49%
Developed since 2002, the windfarm was built in 2006. The start-up took place at February 2007. Produced so far 114 MWh (Fev-07)
Site:
Viso - Celorico de Basto
Equipment:
7 x Enercon E82 de 2 MW
Installed Power:
14 MW
Investment Aprox:
15.400.000 euros
Expected Yearly Production:
33.600 MWh
Equivalent Oil Savings:
2.890 Tons/year (21094 barrels/year)
Avoided CO2 emissions:
31.920 Tons/year