Alfarrobeira Windfarm
Empreendimento Eólico do Rego, Lda.
Catavento, SA - 49%
Being the first part of a larger set to be installed in Celorico de Basto, the project, developed since 2002, started its commercial operation in November 2005. So far it has produced over 1.648 MWh (Fev-07)
Site:
Viso - Celorico de Basto
Equipment:
1 x Enercon E48 de 600 kW
Installed Power:
600 kW
Investment Aprox:
880.000 euros
Expected Yearly Production:
1.440 MWh
Equivalent Oil Savings:
124 Tons/year (904 barrels/year)
Avoided CO2 emissions:
904 Tons/year